LetLensEngland

LetLens / Licensing by council / Barnet

Landlord licensing in Barnet

Mandatory HMO licensing applies across England, so a property in Barnet let to five or more people forming two or more households, who share a kitchen, bathroom or toilet, needs a licence. Barnet also runs additional HMO licensing, which can bring smaller HMOs, or every private rental, into licensing.

The licence you need turns on who lives in the property. Find the line that describes your let.

Each fee is for the example property named on its own line, from the council’s published schedule. Other sizes are priced separately; the full schedules, discounts and surcharges are below.

Most recent source check: 6 August 2026. Each figure below carries the date its own source was read.

Or open NW7 1RQ, a postcode near the centre of Barnet, to see what a full report looks like.

Each scheme in detail, and the evidence behind it

Which properties each scheme catches in Barnet, in the council’s own words, with the designations in force, the whole published fee schedule and the source for every figure. The three regimes can stack: a property can need a licence under one and still be caught by another.

Mandatory HMO licensing In force England-wide

Set by national law, not by the council. Any property let to five or more people forming two or more households who share a kitchen, bathroom or toilet needs a licence, anywhere in England.

Fee, 5-bed HMO£1,872£1872 base + £37/unit over 5

Where it applies
National scheme
Which properties
5+ occupants, 2+ households (national mandatory HMO licensing)
The published fee schedule
Base fee
£1,872
Base fee, paid in two parts
£1,061 on application, then £811 when the licence is granted. The council publishes this split for the base fee only, not for the size charge below.
Size charge
£37 per unit above 5
Licence term
Up to 5 years
Fee schedule dated
1 January 2026
Renewal fee by number of units
SizeFeePart 1 + part 2
1 to 5£1,677£866 + £811

Discounts

  • Accredited landlord (LLAS/NLA/RLA/ARLA/NALS/RICS/UKALA) - 10% off Fee 1: £0
  • Charity - 10% off Fee 1: £0
Other charges, all 8
  • New HMO licence up to 5 units for 1 year - total: £1,224
  • New HMO licence up to 5 units for 1 year - Fee 2: £162
  • Renewal HMO licence up to 5 units for 1 year - total: £1,028
  • Selective licence following designation (Burnt Oak/Colindale North/Colindale South) - total (scheme NOT currently in force): £774
  • Selective licence - Fee 1 (scheme NOT currently in force): £388.03
  • Selective licence - Fee 2 (scheme NOT currently in force): £385.97
  • HMO Licensing Fast-Track service (in addition to standard fee): £200
  • Fee 1 amount retained on refund to cover administrative costs: £365

Council source · How to apply · read 6 August 2026

Additional HMO licensing In force

A council may extend HMO licensing to smaller HMOs, typically three or four sharers, across all or part of its area.

Fee, 4-bed HMO£1,872£1872 base + £37/unit over 5

Where it applies
Council-wide
Which properties
Smaller HMOs not covered by mandatory licensing - HMOs occupied by 3 or more people in 2 or more households; also section 257 HMOs (buildings converted into self-contained flats not meeting the Building Regulations 1991, 3+ storeys, 3+ flats, all privately rented, same ownership/control)
Designations in force
Barnet borough-wide additional HMO licensing designation 2022-2027
Designation period
27 October 2022 to 26 October 2027
The published fee schedule, identical to the mandatory scheme’s
Base fee
£1,872
Base fee, paid in two parts
£1,061 on application, then £811 when the licence is granted. The council publishes this split for the base fee only, not for the size charge below.
Size charge
£37 per unit above 5
Licence term
Up to 5 years
Fee schedule dated
1 January 2026
Renewal fee by number of units
SizeFeePart 1 + part 2
1 to 5£1,677£866 + £811

Discounts

  • Accredited landlord (LLAS/NLA/RLA/ARLA/NALS/RICS/UKALA) - 10% off Fee 1: £0
  • Charity - 10% off Fee 1: £0
Other charges, all 8
  • New HMO licence up to 5 units for 1 year - total: £1,224
  • New HMO licence up to 5 units for 1 year - Fee 2: £162
  • Renewal HMO licence up to 5 units for 1 year - total: £1,028
  • Selective licence following designation (Burnt Oak/Colindale North/Colindale South) - total (scheme NOT currently in force): £774
  • Selective licence - Fee 1 (scheme NOT currently in force): £388.03
  • Selective licence - Fee 2 (scheme NOT currently in force): £385.97
  • HMO Licensing Fast-Track service (in addition to standard fee): £200
  • Fee 1 amount retained on refund to cover administrative costs: £365

Council source · read 6 August 2026

Selective licensing No scheme

A council may require a licence for every private rented home in a designated area, whether or not it is an HMO.

Council source · read 6 August 2026

Article 4 and HMO planning permission in Barnet In force

An HMO Article 4 direction is in force in Barnet covering the whole council area, so the permitted-development right to convert a house (C3) into a small HMO (C4) has been removed and planning permission is needed there. Every one of Barnet's 8,915 postcodes is inside a designated area.

HMO Article 4 direction, the whole council area

Article 4 Small Houses in Multiple Occupation (HMO) Direction (A4D14)

Area
the whole council area
Right removed
C3 to C4 (small HMO)
Made
28 May 2015
Confirmed
26 May 2016
In force from
29 May 2016

Council notice or order

A licence is not planning permission

These are two separate consents from two separate parts of the council, and getting one does not give you the other. A licensing team can grant an HMO licence for a property that needed planning permission and never got it.

Where the permission was needed and is missing, the usual consequence lands on the licence. Councils commonly grant a short licence, often twelve months rather than the full term, to give the owner time to apply. If permission is not applied for, is refused, or an appeal fails, the council will generally refuse to extend and let the licence expire, and will generally refuse a fresh application outright once permission has been finally refused. At that point the property cannot lawfully be let as an HMO at all.

This is council practice rather than a statutory rule, and it varies, so confirm it with Barnet before you rely on it. Nottingham City Council publishes its version explicitly and is quoted here as a worked example of the approach.

Nottingham City Council, HMO and permitted development. Indicative only, not planning or legal advice.

The research note behind this verdict
Verified against the council's own position, not just the national register. Barnet's Article 4 page states: 'From 29 May 2016 planning permission is required anywhere in Barnet for change of use from buildings used as dwelling houses (Use Class C3) to buildings used as small scale houses in multiple occupation (Use Class C4)' (https://www.barnet.gov.uk/planning-and-building-control/planning-applications-and-permissions/do-i-need-planning-permission/article-4-directions-barnet and .../planning-policies-and-local-plan/small-houses-multiple-occupation-hmo; www.barnet.gov.uk is Imperva bot-blocked to curl/WebFetch, so the identical council-served pages were read from Barnet's own uat.barnet.gov.uk / admin.uat.barnet.gov.uk mirrors, both showing 2026 site furniture). The sealed direction itself (https://open.barnet.gov.uk/download/2ylny/jyz/A4D14-Article4SmallHousesInMultipleOccupation.pdf, read as page images since it is a scan) is a non-immediate Article 4(1) direction, made under common seal 28 May 2015, CONFIRMED under common seal 26 May 2016, wording 'This Direction shall come into effect in relation to the Area on 29th May 2016', schedule = C3 to C4 small HMO, Class L(b) of Part 3 Sch.2 GPDO 2015; its plan shows the red line following the entire London Borough of Barnet boundary, and the council's supporting case is titled 'Supporting Case for Boroughwide Article 4'. So it is in force today, borough-wide, and permanent (council states it 'can remain in place permanently once it has been confirmed'). the whole borough; parent direction A4D14 'Article 4 Small Houses in Multiple Occupation (HMO)' is in the article-4-direction dataset under organisation-entity 48. The register therefore AGREES with the council on existence, date, PD right and extent - unsurprising, since this is council-published Local Digital Fund data that Barnet itself links to from its HMO Article 4 page ('Barnet is responsible for the correctness of this data'). One query artefact worth noting: entity.json?dataset=article-4-direction&geometry_reference=E09000003 returns 0 rows (direction records carry no geometry); the directions are only reachable via organisation_entity=48. No superseding, immediate, or forthcoming HMO direction was found - the council's Article 4 index page lists only this HMO direction plus conservation-area and agricultural-land directions.

Barnet Article 4 page · checked 26 July 2026

What happens if you let without a licence

Letting or managing an unlicensed property that needs a licence is a criminal offence, under section 72 of the Housing Act 2004 for an HMO and section 95 for a property caught by selective licensing. A council can prosecute, or impose a civil penalty instead. For conduct on or after 1 May 2026 that penalty can be up to £40,000 per offence, raised from £30,000 by the Financial Penalties (Housing Offences and Breach of Banning Orders) Regulations 2026. Tenants and the council can also apply for a rent repayment order, which for conduct from the same date can claw back up to two years of rent, up from one, under section 103 of the Renters' Rights Act 2025.

Both of those maxima apply only to conduct on or after 1 May 2026. Earlier conduct is still judged against the old £30,000 and twelve-month limits. Each breach is normally penalised separately, so an unlicensed portfolio in Barnet multiplies the exposure rather than capping it.

Sources: Housing Act 2004 s72 · SI 2026/319 · Renters' Rights Act 2025 s103 · Shelter Legal England. Indicative only, not legal advice.

The letting market in Barnet

Licensing is only one side of the sum. These are medians from real listings we have collected, with the number of listings behind each one, because a median over a handful of adverts is a different claim from a median over hundreds.

Room rent by outcode

Room rent varies by £110 a month across Barnet’s outcodes, so the council-wide median above is a starting point rather than the answer for a particular street.

Median room rent by outcode in Barnet
OutcodeMedian room rentRoom listingsCheck a postcode
NW11£910 pcm117Check NW11
N3£910 pcm84Check N3
NW7£900 pcm65Check NW7
NW4£850 pcm202Check NW4
HA8£800 pcm208Check HA8

Postcode districts in Barnet

Licensing, Article 4 and the fee all turn on the exact address, because a designated area rarely follows the council boundary. LetLens holds 8,915 Barnet postcodes. Open one of its postcode districts to see the verdict, the local rent evidence and the investment model.

Common questions

Do I need an HMO licence in Barnet?

Mandatory HMO licensing applies across England, so a property in Barnet let to five or more people forming two or more households, who share a kitchen, bathroom or toilet, needs a licence. Barnet also runs additional HMO licensing, which can bring smaller HMOs, or every private rental, into licensing. Additional HMO licensing applies across the whole council.

How much does an HMO licence cost in Barnet?

£1,872 for a five-bedroom, five-person HMO under the mandatory scheme, from the council's published fee schedule. Fee basis: £1872 base + £37/unit over 5. Larger or smaller properties, and any additional or selective scheme, are priced separately.

Is there an Article 4 direction in Barnet?

An HMO Article 4 direction is in force in Barnet covering the whole council area, so the permitted-development right to convert a house (C3) into a small HMO (C4) has been removed and planning permission is needed there. Every one of Barnet's 8,915 postcodes is inside a designated area.

What is the penalty for letting an unlicensed property in Barnet?

Letting or managing a property that needs a licence without one is a criminal offence under the Housing Act 2004. The council can prosecute or impose a civil penalty, which for conduct on or after 1 May 2026 can be up to £40,000 per offence, raised from £30,000 by the Financial Penalties (Housing Offences and Breach of Banning Orders) Regulations 2026. Tenants or the council can also seek a rent repayment order covering up to two years of rent for conduct from that date, up from one year, under section 103 of the Renters' Rights Act 2025. Each breach is normally penalised separately. Indicative only, not legal advice.

Do I need planning permission for an HMO in Barnet?

Where an Article 4 direction applies, yes: it removes the permitted-development right to change a house (use class C3) into a small HMO (use class C4), so that change needs a planning application. An HMO for seven or more residents needs permission anywhere, Article 4 or not. Planning is separate from licensing, and a licence does not give you permission. Where permission was needed and not obtained, councils commonly grant a licence for about twelve months rather than the full term, and generally refuse to extend it if permission is not then granted, which leaves the property unable to be let as an HMO. Practice varies by council, so confirm it with Barnet.

Can I convert a house into a small HMO in Barnet without planning permission?

Not inside the Article 4 area. The direction removes the permitted-development right, so a change of use from C3 to C4 needs a planning application. The direction covers the whole of Barnet, so there is no part of the council where the right still applies.

About Barnet

Barnet is a local housing authority in London, with a population of about 399,000 and 8,915 live postcodes indexed by LetLens. It is the licensing authority for every private rented property inside its boundary, and the local planning authority that decides whether an Article 4 direction applies.

Nearby councils

Licensing stops at the council boundary, so a street on the other side of it can carry a different scheme and a different fee.

Contact Barnet

Barnet licensing team · [email protected] · 020 8359 5355