Landlord licensing in Hackney

Mandatory HMO licensing applies across England, so a property in Hackney let to five or more people forming two or more households, who share a kitchen, bathroom or toilet, needs a licence. Hackney also runs additional HMO licensing and selective licensing, which can bring smaller HMOs, or every private rental, into licensing.

The licence you need turns on who lives in the property. Find the line that describes your let.

Each fee is for the example property named on its own line, from the council’s published schedule. The full schedules, discounts and surcharges are below.

Most recent source check: 6 August 2026. Each figure below carries the date its own source was read.

Or open E8 2LJ, a postcode near the centre of Hackney, to see what a full report looks like.

Each scheme in detail, and the evidence behind it

Which properties each scheme catches in Hackney, in the council’s own words, with the designations in force, the whole published fee schedule and the source for every figure. The three regimes can stack: a property can need a licence under one and still be caught by another.

Mandatory HMO licensing In force England-wide

Set by national law, not by the council. Any property let to five or more people forming two or more households who share a kitchen, bathroom or toilet needs a licence, anywhere in England.

Licence fee, any size£1,400

Where it applies
National scheme
Which properties
5 or more people forming 2 or more households, sharing a kitchen, bathroom or toilet
The published fee schedule
Fee
£1,400
Paid in two parts
£840 on application, then £560 when the licence is granted
Licence term
Up to 5 years
Fee schedule dated
2026

Discounts

  • EPC B and above (off Part B): £100
  • EPC C (off Part B): £50
  • Accredited landlord (off Part B): £100
  • Multi-dwelling, 2nd property onward (off Part A): £100

Council source · How to apply · read 6 August 2026

Additional HMO licensing In force

A council may extend HMO licensing to smaller HMOs, typically three or four sharers, across all or part of its area.

Licence fee, any size£1,400

Where it applies
Council-wide
Which properties
Every HMO as defined by section 254(1)(a)-(d) of the Housing Act 2004 (excluding section 257 HMOs) occupied by three or more persons comprising two or more households (i.e. smaller HMOs of typically 3-4 people that fall below the mandatory 5-person threshold)
Designations in force
London Borough of Hackney Designation of an Area for Additional Licensing 2025
Designation period
1 May 2026 to 30 April 2031
The published fee schedule, identical to the mandatory scheme’s
Fee
£1,400
Paid in two parts
£840 on application, then £560 when the licence is granted
Licence term
Up to 5 years
Fee schedule dated
2026

Discounts

  • EPC B and above (off Part B): £100
  • EPC C (off Part B): £50
  • Accredited landlord (off Part B): £100
  • Multi-dwelling, 2nd property onward (off Part A): £100

Council source · Designated area · read 6 August 2026

Selective licensing In force

A council may require a licence for every private rented home in a designated area, whether or not it is an HMO.

Licence fee, any size£925

Where it applies
17 designated wards
Which properties
Every house occupied under a tenancy or licence (single private-rented household, or up to two individuals sharing) within the 17 designated wards, other than HMOs required to be licensed under the mandatory or additional schemes
Designations in force
London Borough of Hackney Designation of an Area for Selective Licensing 2025
Designation period
1 May 2026 to 30 April 2031

London Borough of Hackney Designation of an Area for Selective Licensing 2025 covers Brownswood, Cazenove, Clissold, Dalston, De Beauvoir, Hackney Central, Hackney Downs, Hackney Wick, Homerton, King's Park, Lea Bridge, London Fields, Shacklewell, Springfield, Stamford Hill West, Stoke Newington, Victoria.

A designation can cover only part of a named ward, so check the exact address rather than relying on the ward name alone.

The published fee schedule
Fee
£925
Paid in two parts
£555 on application, then £370 when the licence is granted
Licence term
Up to 5 years
Fee schedule dated
2026

Discounts

  • EPC B and above (off Part B): £100
  • EPC C (off Part B): £50
  • Accredited landlord (off Part B): £100
  • Multi-dwelling, 2nd property onward (off Part A): £100

Council source · Designated area · read 6 August 2026

Article 4 and HMO planning permission in Hackney None in force

No HMO Article 4 direction is in force in Hackney, so converting a house into a small HMO occupied by no more than six residents (use class C4) is normally permitted development and does not need planning permission on those grounds. An HMO for seven or more residents falls outside class C4 and needs permission anyway.

The research note behind this verdict
The official Hackney Council Article 4 Directions page (hackney.gov.uk/article-4-directions) lists 11 Article 4 Directions, NONE of which remove the C3->C4 (dwellinghouse to small HMO) permitted-development right under GPDO Sch 2 Part 3 Class L. Hackney's Article 4 directions cover: Class E/office/town-centre-to-C3 changes (Designated Industrial Areas, CAZ/Town Centres, Tech City/Dalston/Hackney Central, District/Local Shopping Centres), launderette-to-residential, B8 storage-to-residential, the Chesham Arms pub (A4), and several conservation-area directions (Brownswood, Beck Road, Well Street, Shacklewell Green) removing householder/minor-operations PD rights. No HMO / houses-in-multiple-occupation / C4 direction exists. Multiple independent sources (londonpropertylicensing.co.uk checked Feb 2026; mayfairstudio borough guide 2026) corroborate that Hackney has no small-HMO Article 4, so converting C3 to a 3-6 person C4 HMO remains permitted development. Note: a borough-wide additional HMO LICENSING scheme began 1 May 2026, but licensing is separate from planning and is not an Article 4 Direction. The prior assumption that Hackney has a borough-wide HMO Article 4 is INCORRECT as of this check.

checked 25 July 2026

What happens if you let without a licence

Letting or managing an unlicensed property that needs a licence is a criminal offence, under section 72 of the Housing Act 2004 for an HMO and section 95 for a property caught by selective licensing. A council can prosecute, or impose a civil penalty instead. For conduct on or after 1 May 2026 that penalty can be up to £40,000 per offence, raised from £30,000 by the Financial Penalties (Housing Offences and Breach of Banning Orders) Regulations 2026. Tenants and the council can also apply for a rent repayment order, which for conduct from the same date can claw back up to two years of rent, up from one, under section 103 of the Renters' Rights Act 2025.

Both of those maxima apply only to conduct on or after 1 May 2026. Earlier conduct is still judged against the old £30,000 and twelve-month limits. Each breach is normally penalised separately, so an unlicensed portfolio in Hackney multiplies the exposure rather than capping it.

Sources: Housing Act 2004 s72 · SI 2026/319 · Renters' Rights Act 2025 s103 · Shelter Legal England. Indicative only, not legal advice.

The letting market in Hackney

Licensing is only one side of the sum. These are medians from real listings we have collected, with the number of listings behind each one, because a median over a handful of adverts is a different claim from a median over hundreds.

Room rent by outcode

Room rent varies by £140 a month across Hackney’s outcodes, so the council-wide median above is a starting point rather than the answer for a particular street.

Median room rent by outcode in Hackney
OutcodeMedian room rentRoom listingsCheck a postcode
E8£1,150 pcm214Check E8
E9£1,010 pcm197Check E9

Postcode districts in Hackney

Licensing, Article 4 and the fee all turn on the exact address, because a designated area rarely follows the council boundary. LetLens holds 4,566 Hackney postcodes. Open one of its postcode districts to see the verdict, the local rent evidence and the investment model.

Common questions

Do I need an HMO licence in Hackney?

Mandatory HMO licensing applies across England, so a property in Hackney let to five or more people forming two or more households, who share a kitchen, bathroom or toilet, needs a licence. Hackney also runs additional HMO licensing and selective licensing, which can bring smaller HMOs, or every private rental, into licensing. Additional HMO licensing applies across the whole council. Selective licensing covers 17 designated wards.

How much does an HMO licence cost in Hackney?

£1,400 under the mandatory scheme, from the council's published fee schedule. The council charges the same whatever the size of the HMO. Any additional or selective scheme is priced separately.

Is there an Article 4 direction in Hackney?

No HMO Article 4 direction is in force in Hackney, so converting a house into a small HMO occupied by no more than six residents (use class C4) is normally permitted development and does not need planning permission on those grounds. An HMO for seven or more residents falls outside class C4 and needs permission anyway.

Which wards in Hackney are covered by licensing?

Selective licensing under London Borough of Hackney Designation of an Area for Selective Licensing 2025 covers Brownswood, Cazenove, Clissold, Dalston, De Beauvoir, Hackney Central, Hackney Downs, Hackney Wick, Homerton, King's Park, Lea Bridge, London Fields, Shacklewell, Springfield, Stamford Hill West, Stoke Newington, Victoria. A designation can cover only part of a named ward, so check the exact address rather than relying on the ward name alone.

What is the penalty for letting an unlicensed property in Hackney?

Letting or managing a property that needs a licence without one is a criminal offence under the Housing Act 2004. The council can prosecute or impose a civil penalty, which for conduct on or after 1 May 2026 can be up to £40,000 per offence, raised from £30,000 by the Financial Penalties (Housing Offences and Breach of Banning Orders) Regulations 2026. Tenants or the council can also seek a rent repayment order covering up to two years of rent for conduct from that date, up from one year, under section 103 of the Renters' Rights Act 2025. Each breach is normally penalised separately. Indicative only, not legal advice.

About Hackney

Hackney is a local housing authority in London, with a population of about 281,000 and 4,566 live postcodes indexed by LetLens. It is the licensing authority for every private rented property inside its boundary, and the local planning authority that decides whether an Article 4 direction applies.

Nearby councils

Licensing stops at the council boundary, so a street on the other side of it can carry a different scheme and a different fee.

Contact Hackney

Hackney licensing team · [email protected] · 020 8356 4866