HMO change-of-use planning

Know the HMO planning route before you commit.

Check the planning route, Article 4 position and statutory fee.

Managed HMO planning application: £900. No VAT. Statutory and specialist charges are separate.

Free planning check

Check your property

No account and no full address at this stage.

Start typing and choose a postcode.

Small and large HMOs follow different planning routes.

Checked against LetLens Article 4 records

  • Postcode-specific routeArticle 4 and occupancy checked
  • Drawings includedExisting and proposed submission plans
  • Fully managed applicationPlans, forms and council liaison

Independent application support, not a council or government service.

A fully managed application

We handle the work from documents to council decision.

You give us the property information and anything you already hold. We assemble, prepare and manage the planning application from there.

Check your postcode
  1. 01

    Gather every required document

    We review what you hold, confirm the planning history, identify the supporting evidence and separate any third-party survey or specialist costs.

  2. 02

    Complete all application forms

    We prepare the change-of-use application and the information required for a valid submission.

  3. 03

    Finalise all required drawings

    We prepare the existing and proposed floor plans, location plan and site plan.

  4. 04

    Submit and deal with the council

    We lodge the application, handle validation and respond to routine officer questions and follow-up.

Licensing is not planning

One approval never silently stands in for the other.

An HMO licence and planning permission are separate decisions made under different rules. The landing page keeps them distinct while showing when both may be needed.

  • Article 4 is checked against the postcode evidence LetLens holds.
  • Seven or more occupants are treated as a large-HMO planning question.
  • Unresolved boundaries are flagged for address-level review, not guessed.

Common questions

Before you apply for HMO planning permission

Do I need planning permission for an HMO?

A change from a house in use class C3 to a small HMO in class C4 can be permitted development, unless an Article 4 direction or planning condition has removed that right. A large HMO generally needs planning permission.

What does an HMO Article 4 direction do?

It can remove the permitted-development right to change a dwellinghouse into a small HMO in the area it covers. It does not itself grant or refuse an application.

Are the architectural drawings included?

The proposed service scope shown here includes the standard existing and proposed plan set, location and site plans needed for a typical change-of-use submission. Any unusual surveys or specialist reports are quoted separately.

How long does a planning application take?

The council controls determination time. We can prepare and submit the package, but we do not promise the council's timetable or the outcome.

Does planning permission replace the HMO licence or PRS registration?

No. Planning permission, property licensing and PRS Database registration are separate requirements. A property can need all three. You can check its PRS Database registration deadline by postcode.

What should I prepare for the separate HMO licence?

The HMO licence application guide has a printable checklist for the people, floor plan, property details and certificates councils commonly request.

Where can I compare HMO Article 4 restrictions across England?

The LetLens 2026 HMO and Article 4 dataset covers all 296 English councils, including whether a direction applies across all or only part of each council.

Start with the useful answer

Check the HMO planning position for your postcode.

Check my HMO